Tag Archives: Earthworks

Riverside Resource Recovery Facility Stabilisation for Costain

The Riverside Resource Recovery Facility at Belvedere, in the London Borough of Bexley will provide cost savings for London Borough Councils upstream of the Thames. Continue reading

Tagged ,

A3 Hindhead

Earthworks for Highways Agency’s A3 Hindhead Tunnel to mix the site won sands with cement to achieve a Class 3 foundation as described in IAN 73. Continue reading

Tagged ,

M25 Junction 12 to 15

The McArdle Group completed this design and build project for the M25 (Junction 12 to 15) and Heathrow Terminal 5 (T5)
Continue reading

Tagged ,

M1 Junctions 6a-10

In 2005 the Balfour Beatty Skanska Joint Venture asked McArdle Contracts Ltd to provide expertise and experience in motorway reconstruction earthworks for the M1 Junctions 6a-10 scheme Continue reading

Tagged ,

Battersea Reach Block A enabling works

The McArdle Group undertook the enabling works for construction of Block A within the Battersea Reach development in Wandsworth, London SW18. Continue reading

Tagged