20 January 2010
McArdle Stabilisation win another embankment slip repair
McArdle Stabilisation has won a further contract off the back of the very successful A21 Embankment Slip Repair for Balfour Beatty Mott MacDonald (previously Interroute). This contract has similar tight working areas to the A21 contract, is programmed to take 4 weeks, cutting, modifying and backfilling up to 3000m3 of soil on top of a 150mm drainage blanket installed by McArdle. To complete the contract, McArdle are replacing sections of surface water trough drains and carrier drains.
![[logo] McArdle](/gfx/logo_mcardle.gif)

![[logo] McArdle](/gfx/logo_mcardle_footer.gif)
