Client: EWS Railways
Value of contract: £2.1 million
This successful design and build project by the McArdle Group involved construction of a logistics centre on the 2012 Olympic Games site at Pudding Lane, Bow, East London.
The Bow East Logistics Centre would manage the delivery, storage and removal of all the required materials needed to construct the arenas and buildings for the 2012 Olympics. This involved moving aggregate for concrete production, fill material, concrete blocks and waste to and from the Olympic Park.
The works by the McArdle Group included:
- Earthworks
- Sheet Piling
- Decontamination
- Installation of alpha block retaining wall
- Mesh reinforced concrete slabs
- Drainage
- Road and footpath construction
- White lining
- Street furniture
- CCTV
- Level crossings
- Refurbishment of Weighbridge Office