Jan 2011:Wandsworth Underpass

Client: St George South London

Location: Battersea Reach, Wandsworth

Contract Dates: Jan – February 2011

Contract Value: £175,000

Description: Reinstatement of abandoned underpass beneath  Wandsworth Road Bridge

 Works comprise the following:

Demolition and removal of existing brickwork walls currently sealing both ends of the former underpass

Breaking out and removal of existing concrete floor slab

Reduced level excavation with the underpass to achieve new levels

Disposal of excavated soils to suitably licensed landfill facility

Construction of new surface water drainage including manhole and gulleys

Installation of ducting for CCTV

Installation of waterproof membrane within the underpass

Construction of new concrete floor slab

Construction of new blockwork walls

Construction of new ceiling including installation of lighting

Placing new paving and bollards

 Works to adjacent areas includes:

Application of Resin bonded gravel to concrete slope

Construction of new brick wall

Repairs to existing road surfacing and kerbs

Improvement of existing soft landscaped area